Hydro Power Project

HEC SASAJ

Sasaj HPP is located in Southwest part of Albania close to the seacoast of Jonian Sea.

Sasaj is on the highway Vlora-Saranda, at a distance of about 20 km from Saranda.

The axle of Sasaj HPP is set in west part of Lukova village, along Buneci river in front of Sasaj.

This HPP is of derivation type, it has an installed capacity of 8,000 kW (2x400 kW) and annual average output of 38 milion kWh, deducting water using for irrigation purpose. The average flow is 3.2 m3/sec and calculation head 217 m.